Complete system supply checklist.

Turn a product preference into a clear purchasing brief. Review the selection points below with our team before choosing a model.

Concept illustration: Complete system supply checklistConcept illustration · not a model specification

pretty storage · Procurement guide · Updated

01

What belongs in a complete system quotation?

A complete package starts with an agreed equipment list. Identify the PV module model and quantity, battery model and arrangement, inverter or PCS, mounting structure, cable scope, protection devices and monitoring equipment. A package label alone does not define compatibility or installation scope.

02

Separate equipment supply from site work

Record who supplies foundations, site cabling, earthing, grid connection work and lifting equipment. Local installation, permits and commissioning responsibilities need named owners. pretty storage supplies the agreed equipment and can discuss configuration design and remote guidance; the qualified local customer team installs.

03

Confirm the interfaces before ordering

Review DC and AC voltage, phase, power limits, battery communication protocol, cable terminations, protection coordination and monitoring access with the selected model documentation. Ask for a system equipment schedule and interface drawing appropriate to the project.

04

A practical purchasing checklist

Request an itemised bill of materials, model datasheets, applicable documents, packaging dimensions, shipping terms, warranty terms and a written production schedule. List exclusions and optional items so quotations can be compared on the same basis.

Next step: review product families, read related resources, or build your project brief, then continue on WhatsApp.

BEFORE WE TALK

Good questions.
Clearer decisions.

What does the complete supply scope include?

Check solar modules, storage, inverter, mounting, cables, protection and monitoring individually. Mark supplied, locally sourced and excluded items.

How should we prepare a brief for complete system supply checklist?

Include destination, application, quantity and any equipment already considered for complete system supply checklist. We review scope, interfaces and documents together. Installation is by your qualified local team; remote guidance can be agreed with our factory.

Continue exploring.

FACTORY TO YOUR PROJECT

Ready to define your system?

Home and factory paths meet in one project brief, then continue on WhatsApp.

WhatsApp +86 182 0104 2779

Bring your requirements. We’ll help connect the details.

Build your project brief →

Contact opens the project planner; WhatsApp can carry your prepared brief.

WhatsApp