Use these practical questions to prepare a more useful conversation with your supplier. Final equipment and project requirements need model-specific confirmation.
01
Start with the requirement
Grid-connected and independent operation place different demands on the equipment and system design. Confirm the intended operating mode for the selected model.
02
Prepare a useful brief
Send the destination, application, required quantity, site information and equipment already selected. Include any relevant drawings or datasheets so the scope can be reviewed.
03
Agree the next step
Review the proposed model, equipment interfaces, supplied accessories and installation responsibilities before confirming an order. Final specifications and delivery terms are agreed in writing.
Grid-connected and independent operation place different demands on the equipment and system design. Confirm the intended operating mode for the selected model.
How should we prepare a brief for on-grid and off-grid explained?
Include destination, application, quantity and any equipment already considered for on-grid and off-grid explained. We review scope, interfaces and documents together. Installation is by your qualified local team; remote guidance can be agreed with our factory.